Simon was brought up in the market town of Trowbridge in Wiltshire, where he developed a keen interest in rugby, going on to captain the town 1st XV and later coaching the 1st XV and various youth teams.
Due to our continued expansion we have moved to larger and more prestigious Regus operated offices, Houldsworth Mill Business & Arts Centre, on the outskirts of Stockport. Houldsworth Mill, also known as Reddish Mill, is a former cotton mill that was built in 1865.
Due to our continued expansion we have moved to larger and more prestigious Regus operated offices, Houldsworth Mill Business & Arts Centre, on the outskirts of Stockport.
Houldsworth Mill, also known as Reddish Mill, is a former mill that was built in 1865.
Designed by Abraham Stott, it was constructed for Henry Houldsworth, a prominent wealthy mill owner at the time.
This mill was converted by Stephenson Bell architects and provides seventy shared apartments, startup units for emerging hightechnology and arts based businesses with commercial and leisure uses at the lower floors to provide active frontages.
It is currently a Grade II listed building. Our new address and contact details are:
Houldsworth Business & Arts Centre, Houldsworth Street, Stockport SK5 6DA
Tel 0161 975 6088
NEW STAFF
Two new members of staff joined us in early June and have already found life very busy in their new roles.
Simon Holden BSc (Hons) MCIEEM, our Associate Director has over 11 year’s consultancy experience with a sound knowledge of legislation and planning policy relating to ecology. He is currently a full member of CIEEM.
He is an experienced surveyor for protected species (bats, badger, birds, otter, water vole, great crested newt, white clawed crayfish, reptiles, barn owl) and has survey licences for bats, GCN, white clawed crayfish, barn owl and lesser silver water beetle.
Currently he is undertaking habitat surveys (extended Phase 1) for a number of proposed developments in the Cheshire, Midlands and London area.
Joleen Harris MCSM MSc MEarthSci FGS, our GeoEnvironmental Consultant has over three years experience in mineral exploration across Ireland, Guyana, Mali and Congo and has a Masters in Mining Geology from Camborne School of Mines. This course focused heavily on environmental impact assessments, rock mechanics, classification systems and laboratory testing techniques for hardness, strength etc. and a wide range of analytical techniques for lithology, soil and water sampling.
She is responsible for the supervision of site investigations, logging of soils & rock, environmental monitoring, scheduling of environmental and geotechnical testing and assisting with the writing of geotechnical, mining, geological and environmental reports.
Joleen is also assisting with the evaluation of potential gold reserves as part of a geological survey and environmental impact assessment and also writing a number of Phase 1 Desk GeoEnvironmental Studies for a variety of developments across the UK.
Her work email address is joleen@earthenvironmental.co.uk
PROJECT NEWS
Newt Surveys, Cheshire
We have recently been procured to conduct a number of Preliminary Ecological Appraisals as part of planning application submissions for new residential and commercial developments. Due to the presence of ponds within the development area eDNA testing has been conducted on several of the sites. This is accepted by local authorities and Natural England as being a legitimate survey method for assessing great crested newt presence between April 15th and June the 30th.
If the eDNA results show great crested newts to be present, Natural England still require a population size class to be established to show the level of mitigation required for a European Protected Species Development Licence. This means that six surveys are needed between March and June, with at least three of these surveys carried out between midApril and midMay. As eDNA sampling cannot be reliably undertaken until midApril, if Great Crested Newts are confirmed present, there may not be enough time to fulfil Natural England’s guidelines for establishing a population size class.
Geotechnical Investigation, Blackpool We have been appointed to carry out a site investigation for a deck renewal scheme in Blackpool. The existing abutments and piers will be utilised to support the new bridge deck on a new reinforced concrete bearing shelf.
The bridge was constructed in the 1920s to replace a level crossing and hence is higher than the general ground level in the vicinity. It is believed that the approach embankments have been constructed using marine dredged aggregates.
Network Rail requires an increased bridge soffit height which will increase the footways and carriageway levels. An understanding of the composition of the approach embankments is therefore required to assess the increase in applied earth pressures to the rear of the abutments.
The existing embankments are steep, with a gradient of 1 in 1.5 on the immediate approach to the bridge; the gradient decreasing with distance away from the bridge. Any increase in height or the application of additional weight at the shoulders risks the stability of the embankment. It is proposed that any additional loading applied to the existing embankments be resisted through the use of piled reinforced concrete retaining walls at the edge of the footway. An understanding of the composition of the approach embankments and the natural material beneath the embankments is therefore required for the design of the piled substructure.
Parliament Street, Liverpool
We are conducting a site investigation in Liverpool for fortyfour new apartments spread over five storeys.
The proposals are split over five levels. The ground floor facilitates car parking allocation, cycle storage and general access to and from the accommodation above. The development at its tallest is 18metres above ground level.
Our work involves geotechnical and environmental investigations in order to establish ground conditions for foundation design and assess potential soil, ground gas and groundwater contamination.
Housing Sites, Colne We have been recently commissioned to investigate the proposed location of two affordable housing developments in Colne, providing ecological, site investigation, geotechnical planning and design support services.
Despite difficult access, with abundant vegetation and trees we were able to conduct a mixture of cable percussive and windowless sampling boreholes.
Future work will involve supporting the client with foundation design work and other submissions during the planning application.
Commercial Development, Asbestos Removal, Holmes Chapel Following an earlier phase of site investigation work we were contacted by the purchasing client to assist with the supervision of asbestos removal operations by the site vendors contractors.
Our work involved swab sampling of the hardstanding surface, air dust monitoring at the site boundary and validating the removal of asbestos fibres and fragments.
Ripponden Slope Stability After construction activities commenced on a site in Ripponden a slope to the rear of the site slipped during a prolonged period of adverse weather.
Construction activities were halted as the slope instability was deemed by the NHBC to be too close to a planned apartment block.
A site investigation was quickly designed and procured which consisted of a number of hand held auger boreholes, due to the adverse terrain and limitations on the imposed loads. As part of this site investigation slip indicators were installed to allow for profiling of the slipped soil mass.
The investigation proved poor ground conditions and a high perched water table.
Following a backanalysis of the slip effective stress parameters were derived which allowed for the design of remedial measures for a reprofile slope. These measures include counterfort drains at 5m spacing along the slope mass, feeding into a drain at the rear of a Gabion Wall system.
Vibration Monitoring, Burnley
Due to the proximity of a sensitive and dilapidated Victorian chimney we were asked to initiate vibration monitoring on a new retail store development in Burnley.
As piling operations and earthworks were planned to be conducted near to the sensitive structures the client required an assessment of ground vibration prior to and during the works.
We installed a secured vibration monitoring system with two geophones near to the structure. This allowed for continuous measurement of induced ground vibration, with the data relayed to the office by modem.
Vibration trigger levels were established with alarms sent to the site managers and project managers mobile phone.
Mathew is a very experienced Civil Engineer who started his career with BNFL and has a strong background in the investigation, assessment and remediation of asbestos contaminated sites. He has previously worked for a number of large consultancy practices and Stockport Borough Council.
In the month of July 2015 we achieved a significant and very proud milestone in the evolution of Earth Environmental & Geotechnical, our 1000th project since formation of the company in March 2013.
Earth Environmental & Geotechnical’s recently opened southern office is generating a lot of interest and has exceeded expectations by over 50% in the first month of trading.
Secured contracts at this early stage have included Phase I desk studies from a range of new clients across the south east (Southern Office), site investigations on residential development sites, a high level remediation strategy review to support a legal dispute and a strategic technical review of a former gasworks site for residential redevelopment.
Colin Buchanan, Director, stated: “Our presence in the south east is certainly generating a lot of interest with existing and new clients. Our approach of providing responsive, commercially-focused advice by highly experienced consultants along with cost-competitive fixed price basic surveys and site investigations is proving popular with our commercial, public sector and domestic clients.”
Colin Buchanan has joined the rapidly expanding Earth Environmental & Geotechnical Ltd business based in Stockport, establishing a new southern regional office in Wokingham, Berkshire. Earth Environmental & Geotechnical performed varied environmental risk assessments.
Colin comes with over 24 years’ experience in the environmental sector specialising in the contaminated land investigation, site remediation, environmental risk and liability, impact management and pollution control.
Colin brings significant experience both in the environmental consulting and remediation contracting market, having worked with clients from the energy, industrial, development, construction, legal, property and financial sectors.
Adam Czarnecki, Managing Director, said: “It is an exciting time in the growth of the business and the time is right to open an office in the south east of England to service and develop our local client base. Colin brings a wealth of experience to the business and we are very pleased to welcome him to the Earth team.”
Colin said: “I have known Adam for over 10 years and monitored Earth’s development with interest since its inception last year. Adam and Liz have founded the business on sound business principles with an attractive market offering and I am excited to join the business at this exciting stage in its development.”
As a result of our busy workload we have recently engaged Jayne Carrick to assist with our expansion plans. Jayne is a very experienced environmental, remediation and sustainability specialist and is currently involved in a number of pre-acquisition geoenvironmental studies, site investigations, sustainability reports and wind farm projects.
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.